Fiberglass Power System Solutions
By leveraging advanced FRP composite technology, we deliver a next-generation power infrastructure solution that balances performance, safety, and environmental protection.
Project Background
The project is located in a mountainous area in China with over 85% forest coverage, characterized by complex terrain dominated by hills and mountains.Due to natural conditions and the limitations of traditional power infrastructure, local villages have long suffered from unstable and inefficient electricity supply, facing the following challenges:
Poor infrastructure adaptability: Traditional concrete utility poles are extremely heavy, prone to cracking, and difficult to transport and install in mountainous areas, resulting in long construction cycles.
Insufficient power supply reliability: Metal components are vulnerable to corrosion and aging, leading to frequent failures and unstable power supply.
High operation and maintenance burden: maintenance is frequent, costly, and technically demanding.
High risk of ecological damage: Conventional construction methods require extensive excavation, causing significant disturbance to vegetation and natural terrain.
Scheme Design
Design Concept
Providing customized FRP power infrastructure solutions, replacing traditional concrete and metal structures with advanced composite materials to fundamentally improve the performance of power construction in mountainous areas.
Design Highlights
Improve transportation and installation efficiency, shorten construction time, and reduce overall project costs in mountainous regions.
Enhance weather resistance and operational safety to minimize power failures.
Extend service life, reduce maintenance frequency and costs, and eliminate theft risks.
Minimize environmental impact and protect fragile mountain ecosystems.
Solutions
1. Site Survey & Solution Optimization (Weeks 1–3)
On-site investigation of terrain and climate conditions, solution optimization, finalization of product specifications and drawings, and initiation of customized production.
2.Transportation & Site Preparation (Week 4)
Segmented transportation of FRP products to the site, protective handling, camp setup, and construction personnel training.
3.Foundation Construction (Weeks 5–6)
Small-scale equipment excavation with differentiated reinforcement solutions, followed by inspection, backfilling, and drainage works.
4.Main Structure Installation (Weeks 7–10)
Installation sequence strictly follows: FRP poles → cross-arms → cables & brackets → fencing → meter boxes / houses → manhole covers → safety markers, ensuring quality control at every step.
5. Testing & Acceptance (Weeks 11–12)
Comprehensive system testing, joint inspection, and corrective actions if required.
6. Operation & Maintenance (Within 1 week after acceptance)
Identify the key points for inspection, maintenance, and problem handling.



Value of the Solution
The project confirm that the FRP solution significantly enhances construction efficiency, operational safety, lifecycle cost performance, and ecological sustainability under challenging mountainous conditions.
Performance Comparison: Advantages of FRP Infrastructure
|
Comparison Aspect |
Traditional Infrastructure (Concrete / Metal) |
FRP Solution |
Project Impact |
|
Transportation & Installation |
Heavy, difficult to transport, high cost |
Lightweight, easy to transport and install |
Transportation efficiency increased by 80%, Installation efficiency increased by 30%, The overall construction period is shortened by 40%. |
|
Service Life |
5–10 years |
20–30 years |
Service life extended by 2–3 times |
|
Safety Performance |
Poor insulation, prone to short circuits |
Excellent insulation, non-conductive |
Power-related accidents reduced by over 90% |
|
Operation & Maintenance Cost |
2–3 comprehensive inspections per year |
Only 1 inspection per year |
Wind resistance rating upgraded to level 12, Anti-icing capability significantly enhanced, Damage rate reduced by 85% in extreme environments, Operation and maintenance costs reduced. |
|
Environmental Impact |
Large-scale ecological disturbance |
Minimal ecological disturbance |
Vegetation disturbance area reduced by 85%, excavation volume reduced by 90%. |
With a professional power engineering design team, mature FRP manufacturing capabilities, and extensive experience in complex terrain and climate conditions, we deliver safe, efficient, environmentally responsible, and sustainable customized power infrastructure solutions.



Improved Water Quality
The transition to inert, non-metallic flow paths completely eliminated metal ion leaching, resulting in a significant improvement in produced water purity.
Enhanced Operational Safety
The composite material construction removed the risks associated with metal corrosion, ensuring safer and more reliable long-term operation.
Higher Maintenance Efficiency
The tripod base design simplified drainage procedures, while the smooth, non-metallic membrane housing surfaces made routine cleaning faster and less labor-intensive.
Visualized System Management
The distinctive and professional equipment appearance supported the plant’s 5S management practices, enabling clear visual separation between the pretreatment area and the RO process zone.
This project demonstrates the superior performance of FRP composite materials in modern water treatment applications. By replacing aging metal equipment with advanced FRP components, the customer achieved higher water quality, improved safety, and a future-proof water treatment system built for long-term performance.
Contact us immediately to discuss your product project requirements
Navigation
Navigation
Contact Us
Tel.: +86 189 3266 2725
E-mail: sale@hbfortis.com
Add.: No.8-1, Zhenxing Street, Matun Town, Zaoqiang County, Hengshui City, Hebei Province
Get in Touch
Get in Touch