Project

FRP Cooling Tower Upgrade Project for Vietnam Foundry Plant

Jan. 27, 2026

Project Background

 

This project involved the upgrade of an existing industrial cooling system at a large foundry plant in Vietnam. In response to increasing production loads and long-standing issues with corrosion, scaling, and high maintenance costs, the client sought a more reliable and energy-efficient cooling solution.

After technical evaluation, our FRP cooling tower system was selected to replace the aging conventional cooling equipment, significantly improving operational stability and extending service life under high-temperature and high-humidity operating conditions.

 

Technical Challenges

 

The foundry’s original cooling system suffered from long-term exposure to hot process water, chemical treatment agents, and a humid tropical climate. Metal structures and internal components showed signs of corrosion and scaling, leading to reduced heat exchange efficiency, increased downtime, and rising maintenance costs.

To address these challenges, we supplied a customized FRP cooling tower system designed specifically for foundry process cooling. The structure and water-contact components were manufactured using corrosion-resistant FRP materials, ensuring long-term stability and consistent cooling performance. The upgraded system was engineered to integrate seamlessly with the plant’s existing piping and circulation system, allowing installation and commissioning with minimal disruption to ongoing production.

 

FRP Cooling Tower Upgrade Project for Vietnam Foundry Plant

 

Performance Advantages

 

Superior corrosion resistance:FRP structural components effectively withstand continuous exposure to warm circulating water, chemical additives, and humid environments, eliminating common corrosion issues associated with steel cooling towers.

Stable thermal performance:Optimized airflow and heat exchange design ensure reliable cooling efficiency, supporting stable production conditions during peak operating loads.

Lightweight modular structure:The FRP cooling tower’s lightweight design simplified on-site installation and reduced structural load requirements, shortening the overall upgrade timeline.

Low maintenance requirements:Compared with traditional metal cooling towers, the FRP system significantly reduces routine maintenance needs, helping lower long-term operating and downtime costs.

 

Project Impact


This project highlights the effectiveness of FRP cooling towers in foundry and metallurgical applications, particularly in tropical climates where corrosion and humidity accelerate equipment degradation. The upgraded system has improved overall cooling reliability and reduced the operational risks previously associated with aging metal structures.

Through this FRP cooling tower upgrade, the Vietnam foundry plant successfully improved cooling system durability, operational stability, and maintenance efficiency. The project further strengthens our track record in industrial cooling system solutions across Southeast Asia and reinforces the role of FRP technology in modern industrial upgrades.

 

Conclusion

 

We specialize in engineered FRP cooling tower solutions for foundry, metallurgy, and heavy industry applications. Through customized design and reliable materials, we help clients improve system durability, reduce maintenance costs, and ensure stable long-term operation.

For detailed technical specifications or additional industrial cooling project references, please contact our sales team or visit our official website.

Contact us immediately to discuss your product project requirements

Contact Us

Contact Us

Tel.: +86 189 3266 2725

E-mail: sale@hbfortis.com

Add.: No.8-1, Zhenxing Street, Matun Town, Zaoqiang County, Hengshui City, Hebei Province

Get in Touch

Get in Touch

Copyright © Hebei Fortis Technology Co., LTD All Rights Reserved | Sitemap | Privacy Policy | Powered by