As a vertically integrated FRP cooling tower manufacturer based in China, we eliminate the middleman markup typically associated with trading companies while maintaining full CE conformity for export into EU and EEA markets. Our integrated cooling solutions are specifically engineered for harsh operating environments—whether you are specifying a corrosion-proof unit for a chemical processing plant, a space-saving modular tower for a commercial HVAC retrofit, or a low-noise closed-circuit system for a data center. By controlling the pultrusion and molding processes in-house, we ensure that every fiberglass-reinforced shell and basin meets CTI certification standards and carries the CE marking required for European market access, with technical documentation and declaration of conformity available before shipment. This combination of factory-direct pricing, verifiable structural integrity, and CE-compliant documentation gives export buyers faster lead times on custom configurations and a smoother path through customs and regulatory review.
Hebei Fortis Technology Co., Ltd Product Brochure
Product Advantages
Because we control the entire production chain—from pultrusion and molding to final assembly—there is no trading company margin layered onto your quote. Buyers receive pricing tied directly to raw material and production costs, and engineering questions are answered by the people who actually build the tower rather than by a sales desk relaying messages. This vertical integration also means custom configurations, such as non-standard basin dimensions or specific fan deck layouts, can be quoted and scheduled without waiting on a third-party supplier's lead time.
The fiberglass-reinforced plastic shell and basin are engineered to withstand continuous exposure to chlorides, acids, and oxidizing agents that would rapidly degrade galvanized steel or concrete structures. This makes the integrated FRP tower particularly suited to chemical processing plants, wastewater treatment facilities, and coastal installations where salt-laden air accelerates metal corrosion. Unlike field-assembled alternatives, the molded FRP components have no seams or fasteners exposed to the process water, reducing the risk of localized breakdown and extending the interval between maintenance interventions.
Each tower ships as a pre-engineered, factory-assembled unit wherever transport dimensions permit, with modular sections designed for straightforward bolted connection on site. This approach removes the need for extensive field fabrication, welding, or concrete basin construction, which in turn shortens commissioning schedules and lowers labor costs for the installing contractor. For retrofit projects in space-constrained mechanical rooms or rooftops, the compact footprint of the integrated configuration allows replacement without major structural modifications to the building.
Application Scenarios
In HVAC and commercial building cooling systems, the FRP cooling tower works by taking warm return water from chillers or air-conditioning condensers, spraying it over the fill media where air flow induces evaporation and heat rejection, and then returning the cooled water to the chiller to absorb heat again in a continuous cycle. The advantages include quiet operation, lightweight and compact design suitable for rooftop or tight installations, resistance to rust and corrosion for extended durability, and low maintenance requirements, all of which contribute to energy savings, consistent indoor comfort, and reduced long-term ownership costs.

In power generation facilities, the FRP cooling tower functions by receiving heated condenser cooling water from turbines, pumping it to the top of the tower for distribution over fill media, where partial evaporation and air contact lower the water temperature before it is recirculated back to the condenser in a closed-loop system. The main benefits here are high thermal efficiency, low weight that simplifies structural support and installation, and superior corrosion resistance that withstands constant moisture and chemical treatment agents, thereby ensuring long-term operational reliability, reduced downtime, and lower overall lifecycle costs for power plants.

In industrial manufacturing environments, the FRP cooling tower operates by circulating hot cooling water from welding machines, hydraulic systems, compressors, and injection molding equipment through the tower, where it is distributed over FRP fill media and cooled via evaporative heat transfer as air is drawn through by fans, after which the cooled water is collected in the basin and returned to the equipment cooling loop. The key advantages in this setting include strong resistance to corrosion from industrial contaminants, oils, and chemical residues in the cooling water, a lightweight yet rugged FRP structure that withstands demanding round-the-clock operations, and reliable, continuous cooling that prevents equipment overheating and production downtime while reducing maintenance costs and extending service life in harsh factory conditions.

Parameter Specifications
|
Product |
FRP Integrated Cooling Tower |
|||||||||
|
|
||||||||||
|
Model |
τ=27℃ |
Main Dimensions (mm) |
Air Volume m³/h |
Fan Diameter (mm) |
Motor Power (kw) |
weight (kg) |
inlet pressure 10⁴Pa |
noise at 10m dB (A) |
||
|
Total Height |
Maximum Diameter |
self-weight |
operating weight |
|||||||
|
DBNL3J-12 |
15 |
2333 |
1210 |
7200 |
700 |
0.6 |
217 |
775 |
1.96 |
40.3 |
|
DBNL3J-20 |
24 |
2423 |
1460 |
12400 |
800 |
0.8 |
244 |
958 |
2 |
41.1 |
|
DBNL3J-30 |
35 |
2642 |
1912 |
18000 |
1200 |
0.8 |
424 |
1734 |
2.21 |
43.5 |
|
DBNL3J-40 |
46 |
3142 |
1912 |
21500 |
1200 |
1.1 |
496 |
1896 |
2.6 |
43.5 |
|
DBNL3J-50 |
57 |
3130 |
2215 |
28000 |
1400 |
1.5 |
617 |
2505 |
2.65 |
44.7 |
|
DBNL3J-60 |
68 |
3430 |
2215 |
32300 |
1400 |
1.5 |
667 |
2829 |
2.78 |
45.7 |
|
DBNL3J-70 |
79 |
3444 |
2629 |
39200 |
1600 |
2.2 |
824 |
3816 |
3.03 |
47 |
|
DBNL3J-80 |
92 |
3744 |
2629 |
43400 |
1600 |
2.2 |
909 |
4240 |
2.86 |
47.5 |
|
DBNL3J-100 |
114 |
3694 |
3134 |
56000 |
1800 |
3 |
1014 |
5932 |
3.15 |
50 |
|
DBNL3J-125 |
142 |
3944 |
3134 |
67200 |
1800 |
4 |
1104 |
6158 |
3.15 |
50.7 |
|
DBNL3J-150 |
171 |
3953 |
3732 |
84000 |
2400 |
4 |
1744 |
8246 |
2.9 |
52 |
|
DBNL3J-175 |
200 |
4203 |
3732 |
94300 |
2400 |
5.5 |
1884 |
8582 |
3.15 |
53 |
|
DBNL3J-200 |
231 |
4235 |
4342 |
112000 |
2800 |
5.5 |
2208 |
11210 |
3.01 |
54.6 |
|
DBNL3J-250 |
283 |
4485 |
4342 |
134300 |
2800 |
7.5 |
2420 |
11983 |
3.26 |
55.6 |
|
DBNL3J-300 |
334 |
4623 |
5134 |
168000 |
3400 |
11 |
3648 |
17173 |
3.5 |
56.8 |
|
DBNL3J-350 |
395 |
4873 |
5134 |
187400 |
3800 |
11 |
3950 |
17850 |
3.75 |
57.3 |
|
DBNL3J-400 |
455 |
5018 |
6044 |
224000 |
3800 |
11 |
4406 |
23132 |
3.6 |
58.8 |
|
DBNL3J-450 |
514 |
5268 |
6044 |
242000 |
3800 |
11 |
4752 |
24510 |
3.85 |
58.8 |
|
DBNL3J-500 |
576 |
5619 |
6746 |
280000 |
4200 |
15 |
5887 |
30062 |
3.7 |
60 |
|
DBNL3J-600 |
680 |
6119 |
6746 |
302200 |
4200 |
18.5 |
6689 |
32164 |
4.2 |
61 |
|
Features |
The FRP cooling tower serves not only as a temperature regulator but also delivers an efficient, durable, and maintenance-free solution with optimized lifecycle costs. By harnessing the unique properties of FRP materials, it fundamentally addresses the critical challenges of corrosion and lifespan limitations in harsh operating environments, making it the go-to choice for cooling systems in modern industrial and commercial facilities. |
|||||||||
|
Application
|
Central air conditioning system: refrigeration station for commercial buildings, hotels and hospitals. |
|||||||||
|
Industrial refrigeration: process cooling for food processing, chemical, pharmaceutical and plastic industries. |
||||||||||
|
Power industry: auxiliary cooling system for thermal power plant and nuclear power plant. |
||||||||||
|
Manufacturing industry: circulating water cooling for metallurgical and mechanical processing plants. |
||||||||||
|
Data center: Provides cooling water for server rooms. |
||||||||||
|
Payment |
T/T, Western Union. |
|||||||||
|
Service |
Customize and design the size and style according to requirements |
|||||||||
Contact us immediately to discuss your product project requirements
Navigation
Navigation
Contact Us
Tel.: +86 189 3266 2725
E-mail: sale@hbfortis.com
Add.: No.8-1, Zhenxing Street, Matun Town, Zaoqiang County, Hengshui City, Hebei Province
Get in Touch
Get in Touch